Situation
Existing, locally-produced jacket reactor systems were difficult to assemble resulting in leaks and breakages.
Objectives
- Improve safety and working practices by reducing leaks
- Enable the use of multiple reactor volumes on a single framework
Results
Improved safety, productivity and reduced downtime