Improved safety, productivity and reduced downtime by switching to Reactor-Ready Contacts: Lee Ji Sung Organisation: Yuhan Corporation Department: Process chemistry Country: South Korea Product: Reactor-Ready Case Study No: CS1022 SituationExisting, locally-produced jacket reactor systems were difficult to assemble resulting in leaks and breakages. Objectives Improve safety and working practices by reducing leaks Enable the use of multiple reactor volumes on a single framework ResultsImproved safety, productivity and reduced downtime