Situation

Existing, locally-produced jacket reactor systems were difficult to assemble resulting in leaks and breakages.

Objectives

  1. Improve safety and working practices by reducing leaks
  2. Enable the use of multiple reactor volumes on a single framework

Results

Improved safety, productivity and reduced downtime