Improve Productivity by Reducing Down-time of Reactor Systems

Improved safety, productivity and reduced downtime by switching to Reactor-Ready
Reactor-Ready

Situation

Existing, locally-produced jacket reactor systems were difficult to assemble resulting in leaks and breakages.

Objectives

  1. Improve safety and working practices by reducing leaks
  2. Enable the use of multiple reactor volumes on a single framework
 

Results

Improved safety, productivity and reduced downtime

  • Contacts Lee Ji Sung
  • Organisation Yuhan Corporation
  • Department Process chemistry
  • Country South Korea
  • Product Reactor-Ready
  • Case Study No. CS1022
""